Volney Solar Farm

PROJECT OVERVIEW
The Volney Solar Farm sits on 61 acres about 30 minutes northwest of Syracuse, NY.   The full development consists of two co-located community solar projects participating in NY Value of Distributed Energy Resources (VDER) program.  These projects will enable local residents to benefit from clean energy by subscribing to the solar farm, and receiving bill credits to offset their National Grid electric charges.  AMS provided turnkey engineering, procurement, and construction services on the Volney Solar Farm, from preparation of construction ready plan sets through to commissioning and testing.   Due to the presence of glacial till observed during pull testing, this 2P single-axis tracker was designed with ground screw foundations to mitigate subsurface risk and the glacial till that was encountered during pull testing.
14 MW
Project Capacity (DC)
61 Acres
Project Design Area
13,997 Tons
CO2 Emissions Offset Annually

Solar Project Timeline

2021

OYA begins planning the site with the landowner and local authorities.

2022

OYA is undertaking permitting and environmental surveys.

2023

Construction is expected to start and the project is connected to the grid.

2024

Construction is compleated and ready to start.